The following titles are available from the Bureau of Reclamation Library. Thank you for checking the list. Alba Title/PublicationQtyCopy/ VolumeAuthor/PublisherYear A River in Common: the Columbia River, the Salmon Ecosystem, and Water Policy1 John M. Volkman8/1997A Survey of Columbia River Basin Water Law Institutions and Policies1 Northwest Water Law and Policy Project11/1997America's Renewable Resources: Historical trends and current challenges1 Kenneth D. Frederick, Roger A. Sedjo1991Annual Report 2004: 19 CALFED Bay-Delta Program Arroyo Pasajero Value Analysis1 1998Attachments to the Final Stage 2 EIR/EIS for the Los Vaqueros Project SCH #910630722Vol. II 9/1993Auburn-Folsom South Unit: Letter from the Secretary of the Interior transmitting supplemental report on the Auburn-Folsom South Unit, Central Valley Project, California, pursuant to section 9(a) of the Reclamation Project Act of 1939 (53 Stat. 1187)1No. 171U.S. Government Printing Office1964Battle Creek Salmon and Steelhead Restoration Project: Draft Supplemental EIS/Revised EIR1 2/2005Biological Assessment; Effects of Central Valley Project and State Water Project Delta Operations on Winter-Run Chinook Salmon1 Randall L. Brown, Sheila Greene10/1992Biological Assessment; Effects of Central Valley Project and State Water Project on Delta Smelt1 California Department of Water Resources United States Bureau of Reclamation10/1993Biological Assessment; Effects of Central Valley Project and State Water Project on Delta Smelt and Sacramento Splittail1 California Department of Water Resources United States Bureau of Reclamation8/1994Biological Residue Data for Evaporation Ponds in the San Joaquin Valley, California1 U.S. Government Printing Office11/1989Central Valley Habitat Joint Venture Implementation Plan2 A component of the North American Waterfowl Management Plan2/1990DEIS Humboldt Project Conveyance2DES 05-07U.S. Department of the Interior, Bureau of Reclamation1/2005Deming Management at Work: Six successful companies that use the quality principles of the world-famous W. Edwards Deming1 Mary Walton1990Developing Options: and overview of efforts to solve agricultural drainage and drainage-related problems in the San Joaquin Valley2 12/1987Draft EIR Peripheral anal Project1 8/1974Draft EIR/EIS Enlargement of Lake Cachuma and Bradbury Dam Safety Modifications1 California Department of Water Resources United States Bureau of Reclamation11/1990Draft EIR/EIS Westlands Water District Water Supply Replacement Project1AppendicesJones & Stokes Associates, Inc.4/1989Draft Environmental Statement on the Reauthorization of the CVP and the Coordinated Operating Agreement for CVP-SWP1Vol. IWater and Power Resources Service; U.S. Fish and Wildlife Service; Western Area Power Administration9/1980Draft Environmental Statement on the Reauthorization of the CVP and the Coordinated Operating Agreement for CVP-SWP1Vol. IIWater and Power Resources Service; U.S. Fish and Wildlife Service; Western Area Power Administration9/1980Draft San Felipe Environmental Statement; Public Hearing held in San Jose, CA1 7/1975Draft Supplement to the Final Environmental Statement San Luis Unit, Central Valley Project, California1 Bureau of Reclamation6/1979Economic an Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies1 U.S. Government Printing Office3/1983Elastomeric Canal Sealants Air-Water-Heat Study1R-93-09Jay Swihart5/1993Endangered Species Act - Section 7 Consultation: Biological Opinion Trinity River Mainstream Fishery Restoration 1 U.S. Bureau of Reclamation, Fish and Wildlife Service10/2000Environmental Evaluation System for Water Resource Planning2 1/1972Estimates of the Risks Associated with Dam Failure1 P. Ayyaaswamy, B. Hauss, T. Hseih, A. Moscati, T.E. Hicks, D. Okrent3/1974Farming for Wildlife: Voluntary Practices for Attracting Wildlife to your Farm1 9/1996Final Environmental Statement; San Luis Unit, Central Valley Project, California1FES 72-36Bureau of Reclamation10/1975Final Stage 2 EIR/EIS for the Los Vaqueros Project SCH #910630722Vol. I 9/1993Future Use and Operations of Lake Berryessa Napa County California: Draft EIS attachments 1-161 10/2003Geochemical, Hydrological, and Ecological Characterization of Kesterson Reservoir: Progress Report1 Earth Sciences Division, Lawrence Berkeley Laboratory Grassland Bypass Project: EIS and EIR1Vol. I URS5/2001Grassland Bypass Project: EIS and EIR1Vol. IIURS5/2001Handbook of Drainage and Construction Products1 A. L. Kramer.1955In Touch With People1No. 9U.S. Government Printing Office1973Intradepartmental Drainage Study Program, Western San Joaquin Valley, California; Area distribution of selenium and other inorganic constituents in shallow ground water: A preliminary Study1 S. J. Deverel, R. J. Gilliom, Roger Fujii, J. A. Izbicki, J. C. Fields11/1984Irrigation History of the West-Central San Joaquin Valley1 4/1989Layperson's Guide to Agricultural Drainage1 Water Education Foundation1986Least-Cost CVP Yield Increase Plan6 U.S. Department of the Interior, Bureau of Reclamation, Mid-Pacific Region; Fish and Wildlife Service10/1995Methodology for Flow and Salinity Estimates in the Sacramento-San Joaquin Delta and Suisun Marsh: 15th Annual progress report to the state water resources control board1 State of California, Department of water Resources6/1994Methodology for Flow and Salinity Estimates in the Sacramento-San Joaquin Delta and Suisun Marsh: 27th Annual progress report to the state water resources control board1 12/2006Methods to Estimate Aquatic Habitat Variables1 Colorado Cooperative Fishery Research Unit Metric Manual1 Lawrence D. Pedde, Warren E. Foote, LeRoy F. Scott, Danny L. King, Dave L. McGalliard1978Mortality of Grass Carp Subjected to Entrainment at Hassayampa Pumping Plant, Central Arizona Project1R-92-01Fred L. Nibling, Jr. Charles R. Liston1/1992Naches/Cowiche Diversion Dam Spillway Modification Project-Fish Barrier Study: summary of investigations1R-93-6Roxanne George, Manuel Menendez Prieto4/1993New Melones Unit Central Valley Project-California: Stanislaus River Basin Alternatives and Water Allocation; Special Report1 9/1980On Farm Irrigation System Evaluation Studies within the El Dorado Irrigation District's Service Area, Final Report - Agreement B539461 2/1982Potential for Treatment of Agricultural Drain Water with Microalgal-Bacterial Systems1 William J. Oswald8/1985Progress Report No. 11 State Water Resources Control Board Order No. WQ 85-1 and Order No. WQ 85-5 for Cleanup and Abatement at Kesterson Reservoir1 Bureau of Reclamation12/1986Reconnaissance Investigation of Water Quality, Bottom Sediment, and Biota Associated with Irrigation Drainage in the Klamath Basin, California and Oregon, 1988-892R-90-4203U.S. Geological Survey; Fish and Wildlife Service; Bureau of Reclamation0/1990Reconnaissance Investigation of Water Quality, Bottom Sediment, and Biota Associated with Irrigation Drainage in the Sacramento National Wildlife Refuge Complex, California, 1988-891R-92-4036Peter D. Dileanis, Stephen K. Sorenson, Steven E. Schwarbach, Thomas C. Maurer1992Reinitiating of Formal Consultation; Biological Opinion of the Effects of Long-term Operation of the Central Valley Project and State Water Project as Modified by Implementing the Preferred Alternation in the Draft EIS/EIR for the Trinity River Mainstream Fishery Restoration Program; Request for Consultation on the Implementation of this Alternative on the Threatened Northern Spotted Owl, Northern Spotted Owl Critical Habitat, and the Endangered Bald Eagle within the Trinity River Basin, and Where Applicable, Central Valley Reservoirs1 U.S. Fish and Wildlife Service10/2000Removal of Ionic Selenium from Water by Ion Exchange: review of literature and brief analysis1 Cal C. Hermann8/1985Report of the Commissioner's Program and Organization Review Team1 8/1993San Felipe Division, Central Valley Project, California1No. 500U.S. Government Printing Office1967San Joaquin River Water Acquisition, 1998 Draft Environmental Assessment and Initial Study1 U.S. Department of the Interior; San Joaquin River Group Authority12/1997Sign Guidelines for Planning, Design, Fabrication, Procurement, Installation, and Maintenance of Signs for Outdoor Public Use Areas1 Bureau of Reclamation3/2002South Delta Improvements Program EIS/EIR Final1Vol. III 12/2006State of Iowa Official Register 1937-19381No. 37The State of Iowa Status of San Joaquin Valley Drainage Problems1No. 127-74State of California, Department of Water Resources12/1974Stream Corridor Restoration; Principles, Processes, and Practices1 The Federal Interagency Stream Restoration Working Group10/1998Streamflow, Dissolved Solids, Suspended Sediment, and Trace Elements, San Joaquin River, California, June 1985-September 19881R-93-4085San Joaquin Valley Drainage Program1993Techniques to Reduce Nitrogen in Drainage Effluent During Transport1 Bureau of Reclamation6/1971The Department of Everything Else: Highlights of interior history1 Robert M. Utley, Barry Mackintosh1988The History of Large Federal Dams: Planning, Design, and Construction2 David P. Billington, Donald C. Jackson, Martin V. Melosi2005The Impact of Federal Programs on Wetlands1Vol. IIU.S. Government Printing Office3/1994Toxic Substances in Agricultural Water Supply and Drainage; Defining the Problems: Proceedings from the 1986 Regional Meetings1 U.S. Committee on Irrigation and Drainage1986Trace Metals in Suisun Bay, California: A Preliminary Report1R-84-4170S. N. Luoma, P. V. Cascos, and R. M. Dagovitz7/1984Tracy Fish Facility Improvement Program: Tracy Fish Test Facility final environmental assessment & initial study1 8/2001Tracy Fish Facility Improvement Program: Tracy Fish Test Facility final environmental assessment & initial study1Appendices 8/2001Trinity River Restoration Program: Summary of the United States Secretary of the Interior record of decision, December 19, 20007 McBain & Trush, Inc. Truckee River operating agreement : draft environmental impact statement/environmental impact report : California and Nevada.1 United States Department of the Interior; Bureau of Reclamation, Fish and Wildlife Service State of California: Department of water Resources2/1998Upper San Joaquin Rive Basin Storage Investigation: Initial Alternatives Information Report2 Bureau of Reclamation; California Department of Water Resources; CALFED Bay-Delta Program6/2005Vallecito Dam Flow Measurement and Weir Calibration1R-94-04Roxanne George5/1994Valley Oak and Riparian Woodland Habitat Mitigation Plan for the Los Vaqueros Project1 1/1993Water Measurement Manual1 U.S. Government Printing Office1997 Alba Scott Technical Information Specialist Mid-Pacific Office Bureau of Reclamation 916-978-5593 [log in to unmask]