Title/Publication |
Qty |
Copy/ Volume |
Author/Publisher |
Year |
|
|
|
|
|
A River in Common: the |
1 |
|
John M. Volkman |
8/1997 |
A Survey of |
1 |
|
Northwest Water Law and Policy Project |
11/1997 |
|
1 |
|
Kenneth D. Frederick, Roger A. Sedjo |
1991 |
Annual Report 2004: |
19 |
|
CALFED Bay-Delta Program |
|
Arroyo Pasajero Value Analysis |
1 |
|
|
1998 |
Attachments to the Final Stage 2 EIR/EIS for the Los Vaqueros Project SCH #91063072 |
2 |
Vol. II |
|
9/1993 |
Auburn-Folsom South Unit: Letter from the Secretary of the Interior transmitting supplemental report on the Auburn-Folsom South Unit, Central Valley Project, California, pursuant to section 9(a) of the Reclamation Project Act of 1939 (53 Stat. 1187) |
1 |
No. 171 |
|
1964 |
|
1 |
|
|
2/2005 |
Biological Assessment; Effects of |
1 |
|
Randall L. Brown, Sheila Greene |
10/1992 |
Biological Assessment; Effects of |
1 |
|
California Department of Water Resources |
10/1993 |
Biological Assessment; Effects of Central Valley Project and State Water Project on Delta Smelt and |
1 |
|
California Department of Water Resources |
8/1994 |
Biological Residue Data for Evaporation Ponds in the San |
1 |
|
|
11/1989 |
|
2 |
|
A component of the North American Waterfowl Management Plan |
2/1990 |
DEIS Humboldt Project Conveyance |
2 |
DES 05-07 |
|
1/2005 |
Deming Management at Work: Six successful companies that use the quality principles of the world-famous W. Edwards Deming |
1 |
|
Mary Walton |
1990 |
Developing Options: and overview of efforts to solve agricultural drainage and drainage-related problems in the |
2 |
|
|
12/1987 |
Draft EIR Peripheral anal Project |
1 |
|
|
8/1974 |
Draft EIR/EIS Enlargement of |
1 |
|
California Department of Water Resources |
11/1990 |
Draft EIR/EIS Westlands Water District Water Supply Replacement Project |
1 |
Appendices |
Jones & Stokes Associates, Inc. |
4/1989 |
Draft Environmental Statement on the Reauthorization of the CVP and the Coordinated Operating Agreement for CVP-SWP |
1 |
Vol. I |
Water and Power Resources Service; |
9/1980 |
Draft Environmental Statement on the Reauthorization of the CVP and the Coordinated Operating Agreement for CVP-SWP |
1 |
Vol. II |
Water and Power Resources Service; |
9/1980 |
Draft San Felipe Environmental Statement; Public Hearing held in |
1 |
|
|
7/1975 |
Draft Supplement to the Final Environmental Statement San Luis Unit, Central Valley Project, |
1 |
|
Bureau of Reclamation |
6/1979 |
Economic an Environmental Principles and Guidelines for Water and Related Land Resources Implementation Studies |
1 |
|
|
3/1983 |
Elastomeric Canal Sealants Air-Water-Heat Study |
1 |
R-93-09 |
Jay Swihart |
5/1993 |
Endangered Species Act - Section 7 Consultation: Biological Opinion |
1 |
|
|
10/2000 |
Environmental Evaluation System for Water Resource Planning |
2 |
|
|
1/1972 |
Estimates of the Risks Associated with Dam Failure |
1 |
|
P. Ayyaaswamy, B. Hauss, T. Hseih, A. Moscati, T.E. Hicks, D. Okrent |
3/1974 |
Farming for Wildlife: Voluntary Practices for Attracting Wildlife to your Farm |
1 |
|
|
9/1996 |
Final Environmental Statement; San Luis Unit, Central Valley Project, |
1 |
|
Bureau of Reclamation |
10/1975 |
Final Stage 2 EIR/EIS for the Los Vaqueros Project SCH #91063072 |
2 |
Vol. I |
|
9/1993 |
Future Use and Operations of Lake Berryessa Napa County California: Draft EIS attachments 1-16 |
1 |
|
|
10/2003 |
Geochemical, Hydrological, and Ecological Characterization of Kesterson Reservoir: Progress Report |
1 |
|
Earth Sciences Division, |
|
Grassland Bypass Project: EIS and EIR |
1 |
Vol. I |
URS |
5/2001 |
Grassland Bypass Project: EIS and EIR |
1 |
Vol. II |
URS |
5/2001 |
Handbook of Drainage and Construction Products |
1 |
|
A. L. Kramer. |
1955 |
In Touch With People |
1 |
No. 9 |
|
1973 |
Intradepartmental Drainage Study Program, |
1 |
|
S. J. Deverel, R. J. Gilliom, Roger Fujii, J. A. Izbicki, J. C. Fields |
11/1984 |
Irrigation History of the |
1 |
|
|
4/1989 |
Layperson's Guide to Agricultural Drainage |
1 |
|
Water Education Foundation |
1986 |
Least-Cost CVP Yield Increase Plan |
6 |
|
|
10/1995 |
Methodology for Flow and Salinity Estimates in the Sacramento-San Joaquin Delta and Suisun Marsh: 15th Annual progress report to the state water resources control board |
1 |
|
State of |
6/1994 |
Methodology for Flow and Salinity Estimates in the Sacramento-San Joaquin Delta and Suisun Marsh: 27th Annual progress report to the state water resources control board |
1 |
|
|
12/2006 |
Methods to Estimate Aquatic Habitat Variables |
1 |
|
|
|
Metric Manual |
1 |
|
Lawrence D. Pedde, Warren E. Foote, LeRoy F. Scott, Danny L. King, Dave L. McGalliard |
1978 |
Mortality of Grass Carp Subjected to Entrainment at Hassayampa Pumping Plant, |
1 |
R-92-01 |
Fred L. Nibling, Jr. Charles R. Liston |
1/1992 |
Naches/Cowiche Diversion Dam Spillway Modification Project-Fish Barrier Study: summary of investigations |
1 |
R-93-6 |
Roxanne George, Manuel Menendez Prieto |
4/1993 |
New Melones Unit Central Valley Project-California: |
1 |
|
|
9/1980 |
On Farm Irrigation System Evaluation Studies within the El Dorado Irrigation District's Service Area, Final Report - Agreement B53946 |
1 |
|
|
2/1982 |
Potential for Treatment of Agricultural Drain Water with Microalgal-Bacterial Systems |
1 |
|
William J. Oswald |
8/1985 |
Progress Report No. 11 State Water Resources Control Board Order No. WQ 85-1 and Order No. WQ 85-5 for Cleanup and Abatement at Kesterson Reservoir |
1 |
|
Bureau of Reclamation |
12/1986 |
Reconnaissance Investigation of Water Quality, Bottom Sediment, and Biota Associated with Irrigation Drainage in the |
2 |
R-90-4203 |
|
0/1990 |
Reconnaissance Investigation of Water Quality, Bottom Sediment, and Biota Associated with Irrigation Drainage in the |
1 |
R-92-4036 |
Peter D. Dileanis, Stephen K. Sorenson, Steven E. Schwarbach, Thomas C. Maurer |
1992 |
Reinitiating of Formal Consultation; Biological Opinion of the Effects of Long-term Operation of the Central Valley Project and State Water Project as Modified by Implementing the Preferred Alternation in the Draft EIS/EIR for the Trinity River Mainstream Fishery Restoration Program; Request for Consultation on the Implementation of this Alternative on the Threatened Northern Spotted Owl, Northern Spotted Owl Critical Habitat, and the Endangered Bald Eagle within the Trinity River Basin, and Where Applicable, Central Valley Reservoirs |
1 |
|
|
10/2000 |
Removal of Ionic Selenium from Water by Ion Exchange: review of literature and brief analysis |
1 |
|
Cal C. Hermann |
8/1985 |
Report of the Commissioner's Program and Organization Review Team |
1 |
|
|
8/1993 |
San Felipe Division, Central Valley Project, |
1 |
No. 500 |
|
1967 |
|
1 |
|
|
12/1997 |
Sign Guidelines for Planning, Design, Fabrication, Procurement, Installation, and Maintenance of Signs for Outdoor Public Use Areas |
1 |
|
Bureau of Reclamation |
3/2002 |
South Delta Improvements Program EIS/EIR Final |
1 |
Vol. III |
|
12/2006 |
State of |
1 |
No. 37 |
The State of |
|
Status of |
1 |
No. 127-74 |
State of |
12/1974 |
Stream Corridor Restoration; Principles, Processes, and Practices |
1 |
|
The Federal Interagency Stream Restoration Working Group |
10/1998 |
Streamflow, Dissolved Solids, Suspended Sediment, and Trace Elements, San Joaquin River, California, June 1985-September 1988 |
1 |
R-93-4085 |
|
1993 |
Techniques to Reduce Nitrogen in Drainage Effluent During Transport |
1 |
|
Bureau of Reclamation |
6/1971 |
The Department of Everything Else: Highlights of interior history |
1 |
|
Robert M. Utley, Barry Mackintosh |
1988 |
The History of Large Federal Dams: Planning, Design, and Construction |
2 |
|
David P. Billington, Donald C. Jackson, Martin V. Melosi |
2005 |
The Impact of Federal Programs on Wetlands |
1 |
Vol. II |
|
3/1994 |
Toxic Substances in Agricultural Water Supply and Drainage; Defining the Problems: Proceedings from the 1986 Regional Meetings |
1 |
|
|
1986 |
Trace Metals in |
1 |
R-84-4170 |
S. N. Luoma, P. V. Cascos, and R. M. Dagovitz |
7/1984 |
Tracy Fish Facility Improvement Program: Tracy Fish Test Facility final environmental assessment & initial study |
1 |
|
|
8/2001 |
Tracy Fish Facility Improvement Program: Tracy Fish Test Facility final environmental assessment & initial study |
1 |
Appendices |
|
8/2001 |
|
7 |
|
McBain & Trush, Inc. |
|
|
1 |
|
United States Department of the Interior; Bureau of Reclamation, Fish and |
2/1998 |
|
2 |
|
Bureau of Reclamation; California Department of Water Resources; CALFED Bay-Delta Program |
6/2005 |
Vallecito Dam Flow Measurement and Weir Calibration |
1 |
R-94-04 |
Roxanne George |
5/1994 |
Valley Oak and Riparian |
1 |
|
|
1/1993 |
Water Measurement Manual |
1 |
|
|
1997 |