Michelle M. Rainbolt, MLIS
Asset Librarian -- Contractor
Bureau of Reclamation, Denver Library
Denver Federal Center
Bldg. 67, Rm. 167 (84-21211)
Denver, CO 80225-0007
303-445-2094
Local Call Number |
Title |
OCLC Holders |
Author |
Publisher |
|
TK 1081 .N53 1985 |
Handbook of hydroelectric engineering |
2 |
Nigam, P. S. |
Roorkee [India] : Nem Chand 1985 |
|
TK 1081 .N6784 1979 |
Prospectus, hydroelectric developments, EHV transmission networks / submitted to the People's Republic of China, presented by the North American Hydropower Associates. |
None |
|
San Francisco, Calif. : North American Hydropower Associates, 1979. |
|
TK 1081 .N6784 1979 |
Prospectus, hydroelectric developments, EHV transmission networks / submitted to the People's Republic of China, presented by the North American Hydropower Associates. |
None |
|
San Francisco, Calif. : North American Hydropower Associates, 1979. |
|
TK 1081 .R54 1976 |
Pumped storage survey / J.B. Riester, S.H. Schwartz, R.A. Bajura ; West Virginia University, Dept. of Mechanical Engineering and Mechanics. |
3 |
Riester, John Bryan, 1950- |
Morgantown, W. Va. : Dept. of Mechanical Engineering and Mechanics, West Virginia University ; , Springfield, Va. : Available from the National Technical Information Service, 1976. |
|
TK 1081 .S635h |
Small hydroelectric projects for rural development : planning and management |
203 |
Goodman, Louis J. |
New York : Pergamon Press 1981 |
|
TK 1081 .U585 |
Experience in operation of hydrosystems |
60 |
International Symposium on Real-Time Operation of Hydrosystems (1981 : Waterloo, Ont.) |
Littleton, Colo. : Water Resources Publi 1982 |
|
TK 1081 .W47 1971 |
Reversible pump/turbines for Raccoon Mountain. |
2 |
Wirschal, Helmut W. |
York, Pa., Allis-Chalmers Corp., Hydro-Turbine Division, 1971? |
|
TK 1083 .C437 1965 |
|
None |
|
Geneva [Switzerland]: Charmilles Engineering Works Ltd., 1965. |
|
TK 1083 .D48 1974 |
Developments and trends in pumped storage design. |
None |
Lahmeyer International. |
[Frankfurt/Main] : Lahmeyer International 1974,06 |
|
TK 1083 .J375 1961 |
Pump turbine equipment and operating problems : American practice / by Frank E. Jaski.
|
None |
Jaski, Frank E. |
Allis-Chalmers Manufacturing Company, Hydraulic Division, [1961] |
|
TK 1083 .L49 1961 |
General planning and optimized size of pumped storage / R.D. Ley, E.S. Loane |
None |
Ley, R. D. |
Reading, Pa. : General Public Utilities Corp, 1961 |
|
TK 1083 .M84 1971 |
Arrangements of hydraulic machines for pumped storage and comparison of cost, efficiency and starting time / by E.H. Mühlemann. |
None |
Mühlemann, E. H. |
Switzerland : Sulzer Brothers Ltd., Escher Wyss Division, 1971. |
|
TK 1083 .S674 1974? |
Multiple use of underground reservoirs for power generation / ǂc by Kenneth E. Sorensen. |
None |
Sorensen, Kenneth E. |
[Chicago, Ill.] : Harza Engineering Company, [1974?] |
|
TK 1083 .W37 1971 |
Trends established from 20 years of pumped storage practice and for the future by J.G. Warnock. |
None |
Warnock, J. G |
[Toronto, Canada] : [Acres Consulting Services], [1971] |
|
TK 1191 .B222 |
Power stations and substations |
21 |
Baptidanov, Lev Nikolaevich. |
Moscow, Peace Publishers 1960,1968 |
|
TK 1191 .B39 1983 |
Bath County Hydroelectric Pumped-Storage Project : Third annual USCOLD Lecture. 2 copies |
8 |
Hagood, James M. |
[ s.l. ] : United States Committee on La 1983 |
|
TK 1191 .I44 1985 |
IEEE guide for power-station noise control |
46 |
IEEE Power Engineering Society. Power Generation Committee. |
New York, NY : Institute of Electrical a 1985 |
|
TK 1191 .I69 1987 |
Integration of utility communication systems : workshop proceedings |
4 |
Blair, W. E. |
Palo Alto, Calif. : Electric Power Resea 1987 |
|
TK 1191 .I865 1974 |
The isolation concept for protection of wire line facilities entering electric power stations : IEEE Interim Committee Report. |
None |
|
New York : Institute of Electrical and Electronics Engineers, 1975. |
|
TK 1191 .L69 1982 |
Tarbela Dam Project, Pakistan : second annual USCOLD lecture |
|
Lowe, John, 1916- |
Atlanta, Ga. : United States Committee o 1982 |
|
TK 1191 .S46 1970 |
Report of the seminar-cum-study tour on load despatch techniques and application of computer technology to power system engineering problems. |
74 |
Seminar on Load Despatch Techniques and the Application of Computers for the Solution of Power System Engineering Problems (1970 : Bombay) |
New York, United Nations, 1970. |
|
TK 1191 .U55 1974 |
Heat sink design and cost study for fossil and nuclear power plants : prepared for the Office of Energy Systems Analysis, Division of Reactor Research and Development, United States Atomic Energy Commission / by the Advanced Engineering Dept., United Engineers & Constructors Inc. |
29 |
United Engineers & Constructors, inc. Advanced Engineering Dept. |
Washington : Division of Reactor Research and Development, United States Atomic Energy Commission ; Springfield, Va. : available from National Technical Information Service, 1974. |
|
TK 1191 .W35 1975 |
Water management by the electric power industry / edited by Earnest F. Gloyna, Herbert H. Woodson, and Howard R. Drew. |
175 |
|
Austin : Center for Research in Water Resources, University of Texas at Austin, c1975. |
|
TK 1193 .M5 J6356 1969 |
Substation site selection and development : Consumer Power Company. |
8 |
Johnson, Johnson & Roy. |
[Ann Arbor, Mich.] : Johnson, Johnson and Roy, 1969. |
|
TK 1193 .M5 J6356 1970 |
Transmission and distribution rights-of-way : selection and development: Consumers Power Company, Jackson, Michigan. |
7 |
Johnson, Johnson & Roy. |
[Ann Arbor, Mich.] : Johnson, Johnson and Roy, 1970. |
|
TK 1193 .U5 A336 1970 |
Thermal effects of electric power plants / by James R. Adams. |
3 |
Adams, James R. |
[San Francisco, Calif.] : [Pacific Gas and Electric Co.], 1970. |
|
TK 1193 .U5 A512 1979 |
Electric power today, problems and potential : a presentation to the October 1978 ASCE national convention. Chicago, Illinois |
57 |
American Society of Civil Engineers. National Energy Policy Committee |
New York : American Society of Civil Eng 1979 |
|
TK 1193 .U5 N277 1972 |
Engineering for resolution of the energy-environment dilemma. |
293 |
|
Washington, National Academy of Engineering,c 1972. |
|
TK 1193 .U5 U587 |
Managing the power supply and the environment; report. |
24 |
United States. Federal Power Commission. National Power Survey Task Force on Environment. |
[Washington, Federal Power Commission 1971 |
|
TK 1423 .H38 1991 |
Hydroelectric development in the United States, 1880-1940. 2 volumes |
93 |
Hay, Duncan. |
Edison Electric Institute 1991 |